Pipe Saddles Homepage > Fig. 48 - Pipe Saddle Support with U-Bolt

Download PDF Download PDF

 

MATERIAL:

Carbon steel stanchion saddle with steel U-Bolt and nuts.

INSTALLATION:

(1) Slip saddle base into riser pipe.

(2) If riser pipe and flange are used, flange is drilled for bolting to steel beam or floor.

(3) Yoke is attached to saddle after pipe is in place.

HOW TO ORDER:
Specify pipe size, figure number, description, material and finish.
FIG. 48 Pipe Saddle Support with U-Bolt

 

Pipe Size

Wgt. (Approx.) lbs. per 100

A

B

4

1075

3

4 3/16

5

1210

3

4 13/16

6

1270

3

5 7/16

8

2130

3

6 15/16

10

2570

3

8 7/16

12

3120

3

9 15/16

14

5000

4

10 15/16

16

5700

4

12 3/8

18

6400

4

13 7/8

20

11350

6

15 3/8

24

13700

6

17 15/16

30

14650

6

19 1/8

32

17400

8

21 5/16

36

26800

8

24 1/2

Pipe Support Hardware
Catalog Price Request
PTP New Catalog

Fill out the request form to get your copy today!