Emergency  
Quote Request  

Piping Technology Field Services

Inspection Checklist -- Hanger / Support Assemblies

Pg. 1,  2,  34

 

  • search for signs of visual cracks, fractures, or corrosion of the spring casing and the following:
       (1)  beam attachment
       (2)  pin
       (3)  spring hanger attachment
       (4)  pipe clamp attachment
       (5)  weldless eye nut
       (6)  threaded rod
       (9)  spring coil
     
  • check the turnbuckle (7) if present, lock nuts (8), and all other threaded items to ensure they are secured and fastened with full thread engagement
  • compare the position of the coil (10) with the hot/cold load indicator and operating range of the spring
  • check the mobility of the load column (11)

 
Inspection Checklist -- Expansion Joints
 
  • check for signs of leakage or a loss of pressure
  • inspect for any distortion or yielding of anchors, hardware, bellows, and piping components
  • observe for any unanticipated movement of piping due to pressure
  • inspect for evidence of instability (squirm) in the bellows
  • check the expansion joint, the guides, and other moveable parts of the system for evidence of binding
 
Examples of Corroded Springs

                     

Pg. 1,  2,  34

 
 


 

Field Services Brochure

                  (request a copy)
 
Field Services
Survey & Inspection
Inspection Checklists
Installation & Maintenance
24x7 Emergency Services
 
Resources
Browse Online Catalog
Technical Bulletin
Related Projects
FAQ

Tools
Spring Sizing Program
Unit Converter
Quotation Request
   

Home | Products | Services | Catalogs | Downloads | Technical | News | Site Map | Contact Us | Privacy Policy
Mailing: P.O. Box 34506, Houston, TX 77234-4506     Location: 3701 Holmes Road, Houston, TX 77051
Phone: (713) 422-2271          Toll Free: (866) 940-2530          FAX: (713) 731-8640          E-MAIL: info@pipingtech.com

Copyright 2010  Piping Technology and Products, Inc. All Rights Reserved.