* Make sure to Report the existing table 240 first. Then copy
and paste any additional items such as the PT&P supports into the file that was
reported from the delivered table 240. Once the PT&P items have been added to the
delivered Table 240, the new table can be loaded into PDS by choosing the
Replace option above.
* Enter file name to replace the existing database Table; node
name and file path must match the file’s directory.